Pre treatment

D3 System works closely with Germany’s leading manufacturers in process optimization and pre-treatment.

In close collaboration with the customer, we offer the pre-treatment that will help to prepare the items to achieve a satisfactory adhesion of paint.

Based on several tests of different types of pre-treatment, the actual process optimization can begin. It is tested at different temperatures to achieve effective pre-treatment and to optimize power consumption.

In plastic painting, we launch a product that can clean the items at room temperature (20oC.)

By changing the purification process from 70-80oC to 20oC, a significant reduction in power consumption is achieved.